What is ELCCR* on Boeing 737? (Electrical Liaison Change Commitment Record)

One of the critical aspects of maintaining an aircraft is the management of changes to its electrical system. The Boeing 737 aircraft, known for its reliability and efficiency, follows a stringent process for documenting and implementing modifications to its electrical components. This process is captured through the Electrical Liaison Change Commitment Record, commonly referred to as ELCCR*. In this article, we will explore the purpose and significance of the ELCCR within the Boeing 737 program.

The Importance of Electrical Liaison Change Commitment Record (ELCCR)

The Electrical Liaison Change Commitment Record (ELCCR) serves as a comprehensive record of electrical modifications made to the Boeing 737 aircraft. It documents the change commitment process followed by Boeing and provides a reference for tracking and maintaining the electrical configuration of the aircraft throughout its operational life.

The ELCCR captures crucial information such as the reason for the change, the proposed modification, its impact on existing systems, as well as any necessary validations and verifications required before implementation. It ensures that all changes are assessed and approved by the appropriate authorities, adhering to stringent safety and regulatory standards.

Moreover, the ELCCR serves as a communication tool between Boeing and the operators of the aircraft. It enables effective coordination and cooperation regarding electrical modifications, ensuring that both parties are aligned and informed throughout the process. This collaborative approach strengthens the overall reliability and safety of the Boeing 737 fleet.

The Detailed Process of the ELCCR

The Electrical Liaison Change Commitment Record (ELCCR) is a meticulous process that involves various stages to ensure the successful implementation of electrical modifications on the Boeing 737 aircraft.

1. Initiation

The first step in the ELCCR process is the initiation phase. It begins with the identification of a need for an electrical change, which could be prompted by various factors such as system enhancements, regulatory requirements, or performance improvements. The need is then evaluated, and a proposal is developed outlining the specifics of the change.

During the initiation stage, the engineering team at Boeing assesses the feasibility of the proposed change and conducts an impact analysis to understand the effect it may have on the existing electrical system. This analysis includes considering factors such as cost, weight, complexity, and compatibility with other aircraft systems.

Once the proposal is developed and evaluated, it moves to the next phase of the ELCCR process.

2. Review and Approval

In the review and approval phase, the proposed change is presented to the appropriate regulatory authorities and engineering teams. These stakeholders thoroughly assess the change proposal to ensure its compliance with safety regulations and the specified operational standards.

During this phase, extensive testing and analysis are conducted on the proposed modification. This includes simulations, lab tests, and sometimes, even flight tests to verify the validity and performance of the change. The review and approval phase aims to mitigate any potential risks and ensure the modification aligns with the overall design philosophy and objectives of the Boeing 737 aircraft.

Once the proposed change receives the necessary regulatory approval and internal endorsements, it moves forward to the implementation phase.

3. Implementation and Documentation

The implementation phase of the ELCCR process involves incorporating the approved change into the aircraft’s electrical system. This stage requires careful planning, coordination, and execution to minimize any potential disruption to regular flight operations.

During the implementation phase, Boeing provides detailed instructions and guidelines to the operators of the Boeing 737 aircraft. These instructions outline the necessary steps and procedures required for integrating the change accurately. Depending on the complexity of the modification, Boeing may also provide engineering support and training to ensure a smooth transition.

After the implementation is completed, thorough documentation of the change is recorded in the Electrical Liaison Change Commitment Record. This documentation includes the final design configuration, updated system schematics, electrical drawings, and any relevant certifications or approvals obtained throughout the process.

The completed ELCCR serves as a permanent record of the electrical modification and becomes a part of the aircraft’s maintenance history. It provides valuable information for future inspections, troubleshooting, and overall electrical system management.

In Conclusion

The Electrical Liaison Change Commitment Record (ELCCR) plays a crucial role in ensuring the safe and efficient operation of the Boeing 737 aircraft. By documenting and managing electrical modifications in a systematic manner, Boeing maintains the integrity and reliability of its aircraft’s electrical system throughout its operational life.

The ELCCR process, which encompasses initiation, review, approval, implementation, and documentation, provides a robust framework for introducing electrical changes while prioritizing safety, regulatory compliance, and operational efficiency. This commitment to meticulousness enables Boeing and its operators to uphold the reputation of the Boeing 737 as a trusted and dependable aircraft worldwide.

For More: What is INBD on Boeing 737? (Inboard)